Friday, November 20, 2009

Window--Electric Success

Well to follow up on the other day--the window installation was a success as was the electrical work of installing the new lights.

It all went smoothly--at one point during the day I had four specialists all working in the same room ant the same time and keeping everything deconflicted.

So--the windows that were not doing their jobs have been replaced with really nice triple-pane windows and should begin really insulating the house and keeping the warm or cool (as desired) in; and the kitchen really looks nice without the huge florescent unit hanging in the middle of it.

I am still amazed that I was able to schedule two different specialities to arrive on the same day and stay out of each other's way! Yay.

And the workmanship was great. So we are enjoying newly lit spaces and are looking forward to quieter and more comfortable spaces.

No comments:

My Zimbio
Top Stories