The Remodel Project: An Update


I haven't written about the remodel project in a few days, but it continues as our basement is transformed.

Cabinets and Counter
November 18, 2018
The results are finally beginning to be seen. Yesterday was spent finally installing the cabinets and counter. What a process that was. We bought cabinets that measures 48 inches. And we bought a premed countertop that measured 48 inches. Silly me. Of course a 48 inch countertop is not big enough for base cabinets of the same size. So, we had to return the 48 inch top and buy a 60 inch top for $40 more and cut 10 inches off it. Ugh, what a waste, but now it all goes together.

The Room
November 18, 2018
I had never cut laminate before and I received some good help at Lowe's. I also got a nice new circular saw. The job went very well. We still have to install an as yet unpurchased toe kick under the cabinets.

We originally were going to install a wall cabinet above the counter, but it arrived damaged and had to be returned. We have since decided to enjoy the space and add some lights instead.


The room is coming together and we have three areas for conversation and enjoyment. There is the bar, the wine barrel table, and the sofa area for watching television. We tried it out with friends on Friday night, and it worked pretty well. 

Chris and I are enjoying the remodeled space.

-- Bob Doan, Elkridge, MD